Q1. Which statement best describes Business Continuity Concepts in Business Continuity? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AIt applies only to visual interface design.
  2. BIt should be understood through its function, dependencies, configuration, and effect on the wider IT service.
  3. CIt is only a naming convention and has no operational effect.
  4. DIt guarantees unlimited capacity without dependencies.
Show answer
Answer: B. It should be understood through its function, dependencies, configuration, and effect on the wider IT service.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Concepts: It should be understood through its function, dependencies, configuration, and effect on the wider IT service.
Report a mistake

Q2. What is the main purpose of Business Continuity Concepts in an Information Technology environment? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AIt eliminates the need for business requirements.
  2. BIts sole purpose is to maximize hardware count.
  3. CIt guarantees security without controls or monitoring.
  4. DIt supports a defined business or technical service while meeting operational, security, and performance requirements.
Show answer
Answer: D. It supports a defined business or technical service while meeting operational, security, and performance requirements.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Concepts: It supports a defined business or technical service while meeting operational, security, and performance requirements.
Report a mistake

Q3. An IT team is working with Business Continuity Concepts. Which action is most appropriate? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. ASkip verification because successful installation proves correctness.
  2. BConfirm requirements and dependencies, apply the change in a controlled manner, and verify the resulting service.
  3. CChange production immediately without checking dependencies.
  4. DChoose a solution only because it is newest.
Show answer
Answer: B. Confirm requirements and dependencies, apply the change in a controlled manner, and verify the resulting service.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Concepts: Confirm requirements and dependencies, apply the change in a controlled manner, and verify the resulting service.
Report a mistake

Q4. Which approach best supports correct configuration or implementation of Business Continuity Concepts? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AUse undocumented defaults in every environment.
  2. BChange several unrelated settings at once and avoid recording them.
  3. CAssume configuration is correct whenever the service starts.
  4. DUse documented requirements and baselines, make controlled changes, and validate the configuration afterward.
Show answer
Answer: D. Use documented requirements and baselines, make controlled changes, and validate the configuration afterward.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Concepts: Use documented requirements and baselines, make controlled changes, and validate the configuration afterward.
Report a mistake

Q5. Which consideration is most important when securing or controlling Business Continuity Concepts? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AUse the same shared credential for every service.
  2. BApply least privilege, secure configuration, appropriate authentication, and monitoring according to the risk.
  3. CGive all users administrator privileges to avoid access problems.
  4. DDisable logging so attackers cannot see logs.
Show answer
Answer: B. Apply least privilege, secure configuration, appropriate authentication, and monitoring according to the risk.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Concepts: Apply least privilege, secure configuration, appropriate authentication, and monitoring according to the risk.
Report a mistake

Q6. Which practice best improves reliability when using Business Continuity Concepts? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AAvoid monitoring to reduce system load.
  2. BDepend on one component and never test recovery.
  3. CTreat backups as unnecessary when storage is new.
  4. DUse monitoring, redundancy or recovery controls where appropriate, and test expected failure scenarios.
Show answer
Answer: D. Use monitoring, redundancy or recovery controls where appropriate, and test expected failure scenarios.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Concepts: Use monitoring, redundancy or recovery controls where appropriate, and test expected failure scenarios.
Report a mistake

Q7. When troubleshooting Business Continuity Concepts, what should be done first? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AIgnore logs because they cannot assist diagnosis.
  2. BEstablish the symptoms and scope, collect evidence, then test the most plausible causes systematically.
  3. CReplace multiple components before collecting evidence.
  4. DAssume the first suspected cause is correct.
Show answer
Answer: B. Establish the symptoms and scope, collect evidence, then test the most plausible causes systematically.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Concepts: Establish the symptoms and scope, collect evidence, then test the most plausible causes systematically.
Report a mistake

Q8. Which evidence best demonstrates that Business Continuity Concepts is operating as intended? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. ARely only on a verbal statement that the system looks fine.
  2. BCount documentation pages regardless of service behavior.
  3. CUse an unrelated metric because it is easy to obtain.
  4. DUse logs, tests, service metrics, or monitoring data tied directly to the stated requirement or objective.
Show answer
Answer: D. Use logs, tests, service metrics, or monitoring data tied directly to the stated requirement or objective.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Concepts: Use logs, tests, service metrics, or monitoring data tied directly to the stated requirement or objective.
Report a mistake

Q9. Which trade-off should be evaluated when selecting or scaling Business Continuity Concepts? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AOperational complexity never affects technology selection.
  2. BBalance performance, availability, security, cost, scalability, and operational complexity.
  3. CAlways maximize one metric and ignore all other constraints.
  4. DOnly purchase price matters in every IT decision.
Show answer
Answer: B. Balance performance, availability, security, cost, scalability, and operational complexity.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Concepts: Balance performance, availability, security, cost, scalability, and operational complexity.
Report a mistake

Q10. Which example best represents professional practice involving Business Continuity Concepts? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AMake untracked production changes whenever convenient.
  2. BAvoid documentation and post-change verification.
  3. CUse personal preference instead of requirements and evidence.
  4. DDocument the objective, implement through controlled procedures, verify the outcome, and retain evidence.
Show answer
Answer: D. Document the objective, implement through controlled procedures, verify the outcome, and retain evidence.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Concepts: Document the objective, implement through controlled procedures, verify the outcome, and retain evidence.
Report a mistake

Q11. Which statement best describes Business Continuity Components in Business Continuity? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AIt is only a naming convention and has no operational effect.
  2. BIt guarantees unlimited capacity without dependencies.
  3. CIt applies only to visual interface design.
  4. DIt should be understood through its function, dependencies, configuration, and effect on the wider IT service.
Show answer
Answer: D. It should be understood through its function, dependencies, configuration, and effect on the wider IT service.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Components: It should be understood through its function, dependencies, configuration, and effect on the wider IT service.
Report a mistake

Q12. What is the main purpose of Business Continuity Components in an Information Technology environment? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AIt guarantees security without controls or monitoring.
  2. BIt supports a defined business or technical service while meeting operational, security, and performance requirements.
  3. CIt eliminates the need for business requirements.
  4. DIts sole purpose is to maximize hardware count.
Show answer
Answer: B. It supports a defined business or technical service while meeting operational, security, and performance requirements.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Components: It supports a defined business or technical service while meeting operational, security, and performance requirements.
Report a mistake

Q13. An IT team is working with Business Continuity Components. Which action is most appropriate? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AChange production immediately without checking dependencies.
  2. BChoose a solution only because it is newest.
  3. CSkip verification because successful installation proves correctness.
  4. DConfirm requirements and dependencies, apply the change in a controlled manner, and verify the resulting service.
Show answer
Answer: D. Confirm requirements and dependencies, apply the change in a controlled manner, and verify the resulting service.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Components: Confirm requirements and dependencies, apply the change in a controlled manner, and verify the resulting service.
Report a mistake

Q14. Which approach best supports correct configuration or implementation of Business Continuity Components? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AAssume configuration is correct whenever the service starts.
  2. BUse documented requirements and baselines, make controlled changes, and validate the configuration afterward.
  3. CUse undocumented defaults in every environment.
  4. DChange several unrelated settings at once and avoid recording them.
Show answer
Answer: B. Use documented requirements and baselines, make controlled changes, and validate the configuration afterward.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Components: Use documented requirements and baselines, make controlled changes, and validate the configuration afterward.
Report a mistake

Q15. Which consideration is most important when securing or controlling Business Continuity Components? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AGive all users administrator privileges to avoid access problems.
  2. BDisable logging so attackers cannot see logs.
  3. CUse the same shared credential for every service.
  4. DApply least privilege, secure configuration, appropriate authentication, and monitoring according to the risk.
Show answer
Answer: D. Apply least privilege, secure configuration, appropriate authentication, and monitoring according to the risk.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Components: Apply least privilege, secure configuration, appropriate authentication, and monitoring according to the risk.
Report a mistake

Q16. Which practice best improves reliability when using Business Continuity Components? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. ATreat backups as unnecessary when storage is new.
  2. BUse monitoring, redundancy or recovery controls where appropriate, and test expected failure scenarios.
  3. CAvoid monitoring to reduce system load.
  4. DDepend on one component and never test recovery.
Show answer
Answer: B. Use monitoring, redundancy or recovery controls where appropriate, and test expected failure scenarios.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Components: Use monitoring, redundancy or recovery controls where appropriate, and test expected failure scenarios.
Report a mistake

Q17. When troubleshooting Business Continuity Components, what should be done first? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AReplace multiple components before collecting evidence.
  2. BAssume the first suspected cause is correct.
  3. CIgnore logs because they cannot assist diagnosis.
  4. DEstablish the symptoms and scope, collect evidence, then test the most plausible causes systematically.
Show answer
Answer: D. Establish the symptoms and scope, collect evidence, then test the most plausible causes systematically.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Components: Establish the symptoms and scope, collect evidence, then test the most plausible causes systematically.
Report a mistake

Q18. Which evidence best demonstrates that Business Continuity Components is operating as intended? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AUse an unrelated metric because it is easy to obtain.
  2. BUse logs, tests, service metrics, or monitoring data tied directly to the stated requirement or objective.
  3. CRely only on a verbal statement that the system looks fine.
  4. DCount documentation pages regardless of service behavior.
Show answer
Answer: B. Use logs, tests, service metrics, or monitoring data tied directly to the stated requirement or objective.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Components: Use logs, tests, service metrics, or monitoring data tied directly to the stated requirement or objective.
Report a mistake

Q19. Which trade-off should be evaluated when selecting or scaling Business Continuity Components? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AAlways maximize one metric and ignore all other constraints.
  2. BOnly purchase price matters in every IT decision.
  3. COperational complexity never affects technology selection.
  4. DBalance performance, availability, security, cost, scalability, and operational complexity.
Show answer
Answer: D. Balance performance, availability, security, cost, scalability, and operational complexity.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Components: Balance performance, availability, security, cost, scalability, and operational complexity.
Report a mistake

Q20. Which example best represents professional practice involving Business Continuity Components? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AUse personal preference instead of requirements and evidence.
  2. BDocument the objective, implement through controlled procedures, verify the outcome, and retain evidence.
  3. CMake untracked production changes whenever convenient.
  4. DAvoid documentation and post-change verification.
Show answer
Answer: B. Document the objective, implement through controlled procedures, verify the outcome, and retain evidence.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Components: Document the objective, implement through controlled procedures, verify the outcome, and retain evidence.
Report a mistake

Q21. Which statement best describes Business Continuity Configuration in Business Continuity? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AIt applies only to visual interface design.
  2. BIt should be understood through its function, dependencies, configuration, and effect on the wider IT service.
  3. CIt is only a naming convention and has no operational effect.
  4. DIt guarantees unlimited capacity without dependencies.
Show answer
Answer: B. It should be understood through its function, dependencies, configuration, and effect on the wider IT service.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Configuration: It should be understood through its function, dependencies, configuration, and effect on the wider IT service.
Report a mistake

Q22. What is the main purpose of Business Continuity Configuration in an Information Technology environment? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AIt eliminates the need for business requirements.
  2. BIts sole purpose is to maximize hardware count.
  3. CIt guarantees security without controls or monitoring.
  4. DIt supports a defined business or technical service while meeting operational, security, and performance requirements.
Show answer
Answer: D. It supports a defined business or technical service while meeting operational, security, and performance requirements.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Configuration: It supports a defined business or technical service while meeting operational, security, and performance requirements.
Report a mistake

Q23. An IT team is working with Business Continuity Configuration. Which action is most appropriate? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. ASkip verification because successful installation proves correctness.
  2. BConfirm requirements and dependencies, apply the change in a controlled manner, and verify the resulting service.
  3. CChange production immediately without checking dependencies.
  4. DChoose a solution only because it is newest.
Show answer
Answer: B. Confirm requirements and dependencies, apply the change in a controlled manner, and verify the resulting service.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Configuration: Confirm requirements and dependencies, apply the change in a controlled manner, and verify the resulting service.
Report a mistake

Q24. Which approach best supports correct configuration or implementation of Business Continuity Configuration? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AUse undocumented defaults in every environment.
  2. BChange several unrelated settings at once and avoid recording them.
  3. CAssume configuration is correct whenever the service starts.
  4. DUse documented requirements and baselines, make controlled changes, and validate the configuration afterward.
Show answer
Answer: D. Use documented requirements and baselines, make controlled changes, and validate the configuration afterward.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Configuration: Use documented requirements and baselines, make controlled changes, and validate the configuration afterward.
Report a mistake

Q25. Which consideration is most important when securing or controlling Business Continuity Configuration? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AUse the same shared credential for every service.
  2. BApply least privilege, secure configuration, appropriate authentication, and monitoring according to the risk.
  3. CGive all users administrator privileges to avoid access problems.
  4. DDisable logging so attackers cannot see logs.
Show answer
Answer: B. Apply least privilege, secure configuration, appropriate authentication, and monitoring according to the risk.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Configuration: Apply least privilege, secure configuration, appropriate authentication, and monitoring according to the risk.
Report a mistake

Q26. Which practice best improves reliability when using Business Continuity Configuration? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AAvoid monitoring to reduce system load.
  2. BDepend on one component and never test recovery.
  3. CTreat backups as unnecessary when storage is new.
  4. DUse monitoring, redundancy or recovery controls where appropriate, and test expected failure scenarios.
Show answer
Answer: D. Use monitoring, redundancy or recovery controls where appropriate, and test expected failure scenarios.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Configuration: Use monitoring, redundancy or recovery controls where appropriate, and test expected failure scenarios.
Report a mistake

Q27. When troubleshooting Business Continuity Configuration, what should be done first? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AIgnore logs because they cannot assist diagnosis.
  2. BEstablish the symptoms and scope, collect evidence, then test the most plausible causes systematically.
  3. CReplace multiple components before collecting evidence.
  4. DAssume the first suspected cause is correct.
Show answer
Answer: B. Establish the symptoms and scope, collect evidence, then test the most plausible causes systematically.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Configuration: Establish the symptoms and scope, collect evidence, then test the most plausible causes systematically.
Report a mistake

Q28. Which evidence best demonstrates that Business Continuity Configuration is operating as intended? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. ARely only on a verbal statement that the system looks fine.
  2. BCount documentation pages regardless of service behavior.
  3. CUse an unrelated metric because it is easy to obtain.
  4. DUse logs, tests, service metrics, or monitoring data tied directly to the stated requirement or objective.
Show answer
Answer: D. Use logs, tests, service metrics, or monitoring data tied directly to the stated requirement or objective.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Configuration: Use logs, tests, service metrics, or monitoring data tied directly to the stated requirement or objective.
Report a mistake

Q29. Which trade-off should be evaluated when selecting or scaling Business Continuity Configuration? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AOperational complexity never affects technology selection.
  2. BBalance performance, availability, security, cost, scalability, and operational complexity.
  3. CAlways maximize one metric and ignore all other constraints.
  4. DOnly purchase price matters in every IT decision.
Show answer
Answer: B. Balance performance, availability, security, cost, scalability, and operational complexity.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Configuration: Balance performance, availability, security, cost, scalability, and operational complexity.
Report a mistake

Q30. Which example best represents professional practice involving Business Continuity Configuration? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AMake untracked production changes whenever convenient.
  2. BAvoid documentation and post-change verification.
  3. CUse personal preference instead of requirements and evidence.
  4. DDocument the objective, implement through controlled procedures, verify the outcome, and retain evidence.
Show answer
Answer: D. Document the objective, implement through controlled procedures, verify the outcome, and retain evidence.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Configuration: Document the objective, implement through controlled procedures, verify the outcome, and retain evidence.
Report a mistake

Q31. Which statement best describes Business Continuity Evaluation in Business Continuity? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AIt is only a naming convention and has no operational effect.
  2. BIt guarantees unlimited capacity without dependencies.
  3. CIt applies only to visual interface design.
  4. DIt should be understood through its function, dependencies, configuration, and effect on the wider IT service.
Show answer
Answer: D. It should be understood through its function, dependencies, configuration, and effect on the wider IT service.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Evaluation: It should be understood through its function, dependencies, configuration, and effect on the wider IT service.
Report a mistake

Q32. What is the main purpose of Business Continuity Evaluation in an Information Technology environment? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AIt guarantees security without controls or monitoring.
  2. BIt supports a defined business or technical service while meeting operational, security, and performance requirements.
  3. CIt eliminates the need for business requirements.
  4. DIts sole purpose is to maximize hardware count.
Show answer
Answer: B. It supports a defined business or technical service while meeting operational, security, and performance requirements.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Evaluation: It supports a defined business or technical service while meeting operational, security, and performance requirements.
Report a mistake

Q33. An IT team is working with Business Continuity Evaluation. Which action is most appropriate? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AChange production immediately without checking dependencies.
  2. BChoose a solution only because it is newest.
  3. CSkip verification because successful installation proves correctness.
  4. DConfirm requirements and dependencies, apply the change in a controlled manner, and verify the resulting service.
Show answer
Answer: D. Confirm requirements and dependencies, apply the change in a controlled manner, and verify the resulting service.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Evaluation: Confirm requirements and dependencies, apply the change in a controlled manner, and verify the resulting service.
Report a mistake

Q34. Which approach best supports correct configuration or implementation of Business Continuity Evaluation? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AAssume configuration is correct whenever the service starts.
  2. BUse documented requirements and baselines, make controlled changes, and validate the configuration afterward.
  3. CUse undocumented defaults in every environment.
  4. DChange several unrelated settings at once and avoid recording them.
Show answer
Answer: B. Use documented requirements and baselines, make controlled changes, and validate the configuration afterward.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Evaluation: Use documented requirements and baselines, make controlled changes, and validate the configuration afterward.
Report a mistake

Q35. Which consideration is most important when securing or controlling Business Continuity Evaluation? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AGive all users administrator privileges to avoid access problems.
  2. BDisable logging so attackers cannot see logs.
  3. CUse the same shared credential for every service.
  4. DApply least privilege, secure configuration, appropriate authentication, and monitoring according to the risk.
Show answer
Answer: D. Apply least privilege, secure configuration, appropriate authentication, and monitoring according to the risk.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Evaluation: Apply least privilege, secure configuration, appropriate authentication, and monitoring according to the risk.
Report a mistake

Q36. Which practice best improves reliability when using Business Continuity Evaluation? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. ATreat backups as unnecessary when storage is new.
  2. BUse monitoring, redundancy or recovery controls where appropriate, and test expected failure scenarios.
  3. CAvoid monitoring to reduce system load.
  4. DDepend on one component and never test recovery.
Show answer
Answer: B. Use monitoring, redundancy or recovery controls where appropriate, and test expected failure scenarios.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Evaluation: Use monitoring, redundancy or recovery controls where appropriate, and test expected failure scenarios.
Report a mistake

Q37. When troubleshooting Business Continuity Evaluation, what should be done first? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AReplace multiple components before collecting evidence.
  2. BAssume the first suspected cause is correct.
  3. CIgnore logs because they cannot assist diagnosis.
  4. DEstablish the symptoms and scope, collect evidence, then test the most plausible causes systematically.
Show answer
Answer: D. Establish the symptoms and scope, collect evidence, then test the most plausible causes systematically.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Evaluation: Establish the symptoms and scope, collect evidence, then test the most plausible causes systematically.
Report a mistake

Q38. Which evidence best demonstrates that Business Continuity Evaluation is operating as intended? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AUse an unrelated metric because it is easy to obtain.
  2. BUse logs, tests, service metrics, or monitoring data tied directly to the stated requirement or objective.
  3. CRely only on a verbal statement that the system looks fine.
  4. DCount documentation pages regardless of service behavior.
Show answer
Answer: B. Use logs, tests, service metrics, or monitoring data tied directly to the stated requirement or objective.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Evaluation: Use logs, tests, service metrics, or monitoring data tied directly to the stated requirement or objective.
Report a mistake

Q39. Which trade-off should be evaluated when selecting or scaling Business Continuity Evaluation? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AAlways maximize one metric and ignore all other constraints.
  2. BOnly purchase price matters in every IT decision.
  3. COperational complexity never affects technology selection.
  4. DBalance performance, availability, security, cost, scalability, and operational complexity.
Show answer
Answer: D. Balance performance, availability, security, cost, scalability, and operational complexity.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Evaluation: Balance performance, availability, security, cost, scalability, and operational complexity.
Report a mistake

Q40. Which example best represents professional practice involving Business Continuity Evaluation? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AUse personal preference instead of requirements and evidence.
  2. BDocument the objective, implement through controlled procedures, verify the outcome, and retain evidence.
  3. CMake untracked production changes whenever convenient.
  4. DAvoid documentation and post-change verification.
Show answer
Answer: B. Document the objective, implement through controlled procedures, verify the outcome, and retain evidence.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Evaluation: Document the objective, implement through controlled procedures, verify the outcome, and retain evidence.
Report a mistake

Q41. Which statement best describes Business Continuity Applications in Business Continuity? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AIt applies only to visual interface design.
  2. BIt should be understood through its function, dependencies, configuration, and effect on the wider IT service.
  3. CIt is only a naming convention and has no operational effect.
  4. DIt guarantees unlimited capacity without dependencies.
Show answer
Answer: B. It should be understood through its function, dependencies, configuration, and effect on the wider IT service.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Applications: It should be understood through its function, dependencies, configuration, and effect on the wider IT service.
Report a mistake

Q42. What is the main purpose of Business Continuity Applications in an Information Technology environment? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AIt eliminates the need for business requirements.
  2. BIts sole purpose is to maximize hardware count.
  3. CIt guarantees security without controls or monitoring.
  4. DIt supports a defined business or technical service while meeting operational, security, and performance requirements.
Show answer
Answer: D. It supports a defined business or technical service while meeting operational, security, and performance requirements.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Applications: It supports a defined business or technical service while meeting operational, security, and performance requirements.
Report a mistake

Q43. An IT team is working with Business Continuity Applications. Which action is most appropriate? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. ASkip verification because successful installation proves correctness.
  2. BConfirm requirements and dependencies, apply the change in a controlled manner, and verify the resulting service.
  3. CChange production immediately without checking dependencies.
  4. DChoose a solution only because it is newest.
Show answer
Answer: B. Confirm requirements and dependencies, apply the change in a controlled manner, and verify the resulting service.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Applications: Confirm requirements and dependencies, apply the change in a controlled manner, and verify the resulting service.
Report a mistake

Q44. Which approach best supports correct configuration or implementation of Business Continuity Applications? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AUse undocumented defaults in every environment.
  2. BChange several unrelated settings at once and avoid recording them.
  3. CAssume configuration is correct whenever the service starts.
  4. DUse documented requirements and baselines, make controlled changes, and validate the configuration afterward.
Show answer
Answer: D. Use documented requirements and baselines, make controlled changes, and validate the configuration afterward.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Applications: Use documented requirements and baselines, make controlled changes, and validate the configuration afterward.
Report a mistake

Q45. Which consideration is most important when securing or controlling Business Continuity Applications? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AUse the same shared credential for every service.
  2. BApply least privilege, secure configuration, appropriate authentication, and monitoring according to the risk.
  3. CGive all users administrator privileges to avoid access problems.
  4. DDisable logging so attackers cannot see logs.
Show answer
Answer: B. Apply least privilege, secure configuration, appropriate authentication, and monitoring according to the risk.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Applications: Apply least privilege, secure configuration, appropriate authentication, and monitoring according to the risk.
Report a mistake

Q46. Which practice best improves reliability when using Business Continuity Applications? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AAvoid monitoring to reduce system load.
  2. BDepend on one component and never test recovery.
  3. CTreat backups as unnecessary when storage is new.
  4. DUse monitoring, redundancy or recovery controls where appropriate, and test expected failure scenarios.
Show answer
Answer: D. Use monitoring, redundancy or recovery controls where appropriate, and test expected failure scenarios.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Applications: Use monitoring, redundancy or recovery controls where appropriate, and test expected failure scenarios.
Report a mistake

Q47. When troubleshooting Business Continuity Applications, what should be done first? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AIgnore logs because they cannot assist diagnosis.
  2. BEstablish the symptoms and scope, collect evidence, then test the most plausible causes systematically.
  3. CReplace multiple components before collecting evidence.
  4. DAssume the first suspected cause is correct.
Show answer
Answer: B. Establish the symptoms and scope, collect evidence, then test the most plausible causes systematically.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Applications: Establish the symptoms and scope, collect evidence, then test the most plausible causes systematically.
Report a mistake

Q48. Which evidence best demonstrates that Business Continuity Applications is operating as intended? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. ARely only on a verbal statement that the system looks fine.
  2. BCount documentation pages regardless of service behavior.
  3. CUse an unrelated metric because it is easy to obtain.
  4. DUse logs, tests, service metrics, or monitoring data tied directly to the stated requirement or objective.
Show answer
Answer: D. Use logs, tests, service metrics, or monitoring data tied directly to the stated requirement or objective.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Applications: Use logs, tests, service metrics, or monitoring data tied directly to the stated requirement or objective.
Report a mistake

Q49. Which trade-off should be evaluated when selecting or scaling Business Continuity Applications? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AOperational complexity never affects technology selection.
  2. BBalance performance, availability, security, cost, scalability, and operational complexity.
  3. CAlways maximize one metric and ignore all other constraints.
  4. DOnly purchase price matters in every IT decision.
Show answer
Answer: B. Balance performance, availability, security, cost, scalability, and operational complexity.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Applications: Balance performance, availability, security, cost, scalability, and operational complexity.
Report a mistake

Q50. Which example best represents professional practice involving Business Continuity Applications? Context: BS Information Technology / IT Governance, Risk & Compliance / Business Continuity.

  1. AMake untracked production changes whenever convenient.
  2. BAvoid documentation and post-change verification.
  3. CUse personal preference instead of requirements and evidence.
  4. DDocument the objective, implement through controlled procedures, verify the outcome, and retain evidence.
Show answer
Answer: D. Document the objective, implement through controlled procedures, verify the outcome, and retain evidence.IT Governance, Risk & Compliance → Business Continuity → Business Continuity Applications: Document the objective, implement through controlled procedures, verify the outcome, and retain evidence.